Final year undergraduate project:

My final year major project was “Performance of Improved Water Mill in Rural Electrification”.

Traditional water mills have low estimated system power output (0.5-1 kW) and low estimated efficiency up to 20-25%. Their utility is also limited to grinding only. IWM replaced the TWM due to their comparatively increased power, marginally better efficiency and variable utilities like paddy milling, hauling, oil expelling and household electrification but due to the lack of the proper design  and performance testing, there is not any standard at the moment in Nepal to check the efficiency and output of the locally fabricated IWM.

The main objective of this research study is to design, and conduct performance analysis of modified version of IWM electrification and control.

Download the complete report: IWM Report

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s